The first public announcement of environmental impact assessment
Anhui Goldman Sachs Chemical Co.,Ltd.entrusted Anhui Tongji Environmental Protection Technology Co.,Ltd.to conduct an environmental impact assessment.According to the requirements of the"Environmental Impact Assessment Public Participation Measures"(Order No.4 of the Ministry of Ecology and Environment),the"Anhui Goldman Sachs Chemical Co.,Ltd.annual output of 6,000 tons of p-(o-,m-)phenylenediamine project(annual output of 2000 tons"Phenylenediamine project)to improve safety conditions and technical renovation project"related matters announced as follows:
1.Project Overview:
(1)Project name:6,000 tons per year(para-ortho-,m-)phenylenediamine project(first-phase annual output of 2,000 tons p-phenylenediamine project)technical improvement project to improve safety conditions;
(2)Construction unit:Anhui Goldman Sachs Chemical Co.,Ltd.;
(3)Construction site:Dingyuan Salt Chemical Industry Park existing factory area;
(4)Nature of construction:technical transformation;
(5)Floor area:No additional land is used,and technical renovation is carried out in the existing factory area;
(6)Construction scale:1.Change the location of the heat-conducting oil furnace room to meet the requirements of the fire separation distance in the current standard"Code for Fire Protection Design of Petrochemical Enterprises"GB 50160-2008(2018 Edition);,Improve the stability of the instrument air and nitrogen gas sources,and improve the intrinsic safety of the device;3.Set up a backup filter to improve the production stability and avoid the risk of online cleaning;4.Improve the safety facilities and protective measures of the distribution room of the Class C workshop device;5 2.Increase the area of the packaging room to meet the space requirements of forklift operations.6.Set up a temporary storage of hazardous wastes to meet the requirements of environmental protection;7.Transform the reducing liquid storage tank and supporting facilities to increase the dehydration effect,reduce the amount of sewage discharge,and optimize the waste water discharge index.8.Two new crystallizers and supporting facilities are added to improve product quality.No new production capacity.
(7)Total investment:11.07 million yuan;
(8)Project code:2019-341125-26-03-024724.
2.Name and contact information of the project construction unit:
Construction unit:Anhui Goldman Sachs Chemical Co.,Ltd.;
Correspondence address:Dingyuan Yanhua Industrial Park existing factory area;
Contact:Song Tao Tel:13855258665.
3.The name and contact information of the environmental impact assessment agency undertaking the evaluation:
EIA unit:Anhui Tongji Environmental Protection Technology Co.,Ltd.
Address:12th Floor,Building 5,Huanyu International Plaza,Yinhe 1st Road,Yongqiao District,Suzhou City,Anhui Province
Contact:Xia Chengjun Tel:0557-3918157 Email:404495420 qq.com
4.Working procedures and main contents of environmental impact assessment
According to the relevant provisions of the"Environmental Impact Assessment Law of the People's Republic of China"and the relevant guidelines of the environmental impact assessment of construction projects,the main working procedures of the environmental impact assessment of this project are:to determine the sensitive points and protection of the project according to the site survey and relevant data collection Objectives:Analyze the environmental status of the project area through relevant environmental monitoring techniques and methods,and publicize the methods and methods of public participation in the project’s environmental impact assessment,collect good suggestions and opinions from the majority of experts,scholars,and surrounding people on the project,supplement Go to the project construction and operation process,and then analyze the possible"three wastes"(including the amount of"three wastes"and the concentration of emissions)generated by the project construction,and then use the relevant models and methods of environmental impact assessment to predict that the project construction may give The impacts of the surrounding natural and social environment will be published in the form of announcements or public announcements to publish the main environmental impact assessment conclusions,clarify the main environmental impact to the public,accept public feedback,and demonstrate the feasibility of project construction from an environmental perspective.
The main contents of the project's environmental impact assessment include:(1)Overview of the proposed project;(2)Engineering analysis of the proposed project;(3)Investigation of the environmental quality status of the proposed project area and evaluation of the current environmental quality;(4)Analyze the adverse effects of the proposed project on the surface water,air,noise,groundwater environment,etc.during the construction and operation periods,and propose corresponding mitigation measures for the adverse effects;(5)Environmental and economic gains and losses of the proposed project and public opinion survey Analysis;(6)Demonstration of feasibility of site selection of the proposed project;(7)Development of environmental management and monitoring plan for the implementation of the proposed project;(8)Evaluation conclusion of the proposed project.
V.Main issues for public comments
The scope of this public participation consultation is the surrounding residents within the scope of environmental impact assessment and people from all walks of life who are concerned about the project construction.
The main issues for public comment include the following aspects:
1.What is your attitude towards the project construction?
2.What aspect do you think the local environmental pollution is in?
3.Can you accept the environmental impact of the project during the construction period?
4.What is the impact on the environment after the project is completed?
5.What is the impact of the project on the quality of life?
6.From the perspective of environmental protection,what are your suggestions and requirements for this project?
VI.Main ways of public opinion
The public can express opinions and opinions on the project construction and EIA work by telephone,letter or interview to the designated address.
Download link for public comment form of environmental impact assessment of construction project:/u/39ce5082-b060-4ab1-8442-db28e641febc/file/6372548213525212121747.docx See attached file for detailed table
Seven,others
The time for soliciting opinions is 10 working days from the day of public announcement.
Anhui Goldman Sachs Chemical Co., Ltd.
Anhui Tongji Environmental Protection Technology Co., Ltd.
May 13, 2020